PRODUKTIVITAS ANGKUTAN LORI DORONG DI HUTAN JATI

Apul Sianturi

Abstract


 A study on the productivity of lorry transportation in the teak forest was carried out in 1982, at  three forest  Districts. Time study have been conducted for this purpose.

The Study shows that:

  1. Log loading productivity of a 6-men crew are 2.2, 1.7, and 1 m3 per hour in the Bojonegoro Mantingan, and Blora Forest Districts respectively with an average of 1.6 m3 per hour.
  2. Loading capacity of one lorry varies from 2. 6 to 4.7 m3 of logs with an average of  3.6 m3.
  3. Lorry speed varies from 5.7 to 8.6 km per hour, with an average of 6.9 km per hour.
  4. Unloading productivity varies from 5.6 to12.9 m3 per hour, with an average of 7.5 m3 per hour.
  5. Hauling cost varies from Rp. 86 to Rp. 92 per m3km, with an average of Rp. 88 per m3 km.

 


Keywords


varies;productivity;conducted;forest

References


Brown, N. C. 1958. Logging. John Wiley and Sons Inc. New York.

FAO. 1974. Logging and log transporting in Tropical high Forest. FAO Forestry development, Paper XI.18. Rome.

Soeharto, R.M.1957. Pemilihan pengangkutan dengan jalan rel dan jalan mobil di Jawa. Rimba Indonesia III (1 ­ 2): 8 ­ 93.

Widarmana, S. dan I.G. Oka.1972. Standarisasi jalan angkutan hasil hutan untuk hutan jati. Buletin Persatuan Sarjana Kehutanan Indonesia. Tahun VIII No. 1 ­ 2.




DOI: https://doi.org/10.20886/jphh.1984.1.4.20-23

Refbacks

  • There are currently no refbacks.


JURNAL PENELITIAN HASIL HUTAN INDEXED BY:

More...


Copyright © 2015 | Jurnal Penelitian Hasil Hutan (JPHH, Journal of Forest Products Research)

eISSN : 2442-8957        pISSN : 0216-4329

       

JPHH is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.